Commit Graph

93 Commits

Author SHA1 Message Date
Matt McWilliams ab6f517d27 Rails work 2023-01-17 12:04:03 -05:00
Matt McWilliams f127dc1128 Merge remote-tracking branch 'origin/capper' into capper 2023-01-14 15:26:07 -05:00
Matt McWilliams 0b816ae8e1 Adjust the position of the Z axis, move the linear bearing up and down to prevent binding on motion 2023-01-14 15:25:53 -05:00
Matt McWilliams c600fea4e1 Start rails concept 2023-01-12 19:26:05 -05:00
Matt McWilliams 92067bdbef Add top part to assembly 2023-01-11 19:17:15 -05:00
Matt McWilliams c181e003a3 First draft of base 2023-01-07 18:43:59 -05:00
Matt McWilliams 597137670d Merge base work with knob changes 2023-01-06 10:31:25 -05:00
Matt McWilliams 3036aebbc4 Knob and collar work 2023-01-06 09:18:03 -05:00
Matt McWilliams cbe6477af2 Improvements to bearing and Tnut size 2023-01-05 17:35:25 -05:00
Matthew McWilliams c2546d2bc5 Add m3 nuts and bolts to threaded z movement 2023-01-05 14:40:25 -05:00
Matt McWilliams 46be1bfd3b Assembly work. Adjusted design to simplify placement of 2 linear bearings 2023-01-04 23:11:48 -05:00
Matt McWilliams 1029885047 Update threaded Z, still needs m3 bolts 2023-01-04 18:26:22 -05:00
Matt McWilliams 164bde8cce All arri s mount and jk lens assembly work. need to do some branch cleanup on this project and tackle capper issues for merge of this branch. 2023-01-03 21:16:19 -05:00
Matt McWilliams 41504caac9 Increase the bolt size on the bellows board 2023-01-02 17:11:44 -05:00
Matt McWilliams 9b34b4e026 Adjust the height of the mount (-14.5mm) and make bolt voids larger 2023-01-02 14:33:16 -05:00
Matt McWilliams 95612c1d18 Add m3 nuts 2023-01-02 14:30:54 -05:00
Matt McWilliams 0829ec9081 Use a variable 2023-01-02 13:53:41 -05:00
Matt McWilliams ef0d246901 Increase the inner diameter of the bellows board to allow the threads to pass through cleanly and be held in place by the screw 2023-01-02 13:53:30 -05:00
Matt McWilliams 925659ba4b Create an Arri S mount for the JK rails 2023-01-01 11:43:21 -05:00
Matt McWilliams 20c9287ac2 Work on concept JK lens assembly 2022-12-24 17:36:25 -05:00
Matt McWilliams 8aaa2b8940 Add a concept JK lens assembly 2022-12-24 01:55:11 -05:00
Matt McWilliams 30bd35e21d Add an M4 nut to the common OpenSCAD lib 2022-12-24 01:54:57 -05:00
Matthew McWilliams 0c2e39f0b2 Arri bellows work 2022-12-23 23:01:37 -05:00
Matt McWilliams ee1e9c9feb Stepper firmware is working. Needed extra tape around coupling connector to add friction to connection and now it keeps. 2022-11-04 19:37:11 -04:00
Matt McWilliams fcb77232ec Create the driveCoupling module for the stepper motor design 2022-10-30 12:14:25 -04:00
Matt McWilliams 1fcbec7466 Work on stepper motor design and software. Motor still moves more slowly than it should but will investigate multiple factors leading to this result 2022-10-28 19:46:02 -04:00
Matt McWilliams bb5b7c7897 Add divot to the drive coupling 2022-10-28 07:44:19 -04:00
Matt McWilliams 42b3aa767d Allow for even more space for microswritch 2022-10-28 01:32:58 -04:00
Matt McWilliams b20a6084e6 Allow for more space for the microswitch 2022-10-27 18:10:13 -04:00
Matthew McWilliams d9a8576701 Adjust size of drive coupling for the DC connector 2022-10-21 16:05:56 -04:00
Matthew McWilliams 69273d2a1c Increase scale of motor shaft void by 5% 2022-10-21 15:26:17 -04:00
Matthew McWilliams 755ea757f7 Add set screw for bearing and counter sink bolt caps for other cap m3s 2022-10-21 15:24:21 -04:00
Matt McWilliams 81fc54af8d DC motor design has all components designed, need to print, test and adjust. 2022-10-19 06:38:56 -04:00
Matt McWilliams 4281ca4390 Work on Arri-S DC motor 2022-10-16 19:03:02 -04:00
Matt McWilliams 3419172535 Arri-S work 2022-10-15 00:13:05 -04:00
Matt McWilliams 206c266b08 Added Arri-S motor and cap measurements as taken 10/8/2022 2022-10-09 11:22:12 -04:00
Matthew McWilliams 5026cf869f Arri-S work 2022-10-07 19:47:56 -04:00
Matt McWilliams 1964d6002d Add mono logo as png, but might use svg instead. Render crashed PC. 2022-07-22 21:56:43 -04:00
Matt McWilliams ea055d6e56 Capper case candidate 2022-07-13 23:04:00 -04:00
Matthew McWilliams bc48765b35 Start work on base 2022-07-13 18:16:43 -04:00
Matthew McWilliams 70c2c695f0 All capper work. Need to wrap all actions in the 'b' command and push functionality to a lower level to prevent unneeded complexity. 2022-07-13 15:21:26 -04:00
Matthew McWilliams c33c6e24f6 Work on motor rod 2022-07-13 09:01:25 -04:00
Matt McWilliams 2924efe39f Reduce the size of the void for the screw in the cap. 2022-06-28 08:34:29 -04:00
Matt McWilliams e275539fb0 Remove endstop completely and start rounding surfaces. 2022-06-22 07:45:01 -04:00
Matt McWilliams 4c13c54815 Updates to endstop mount design. Had incorrectly positioned voids for SMD chips on the endstop 2022-06-20 13:00:40 -04:00
Matt McWilliams 62a66f5f6d More mount work and start of endstop logic. Rebuilding the B&H projector unity. 2022-06-17 23:39:19 -04:00
Matt McWilliams 3a435933e3 Work on the opto endstop mount. This needs to be re-oriented before next print. 2022-06-16 00:29:31 -04:00
Matt McWilliams 78f7ac0e68 Mount work 2022-06-13 22:46:23 -04:00
Matt McWilliams 04a0330327 All work on first draft of capper hardware 2022-06-12 22:26:03 -04:00
Matt McWilliams 2f9201716a All capper work. Debug firmware for testing. STL of cap as printed. 2022-06-12 13:14:43 -04:00