Matt McWilliams
|
49464cd25a
|
Finished the design of the lens assembly base z attachment
|
2023-02-02 19:48:30 -05:00 |
Matt McWilliams
|
d0fe54b429
|
Add m5 nut to the common lib
|
2023-02-02 19:48:08 -05:00 |
Matt McWilliams
|
2dce6f4b08
|
Merge branch 'capper' of git.sixteenmillimeter.com:16mm/mcopy into capper
|
2023-01-31 11:52:13 -05:00 |
Matt McWilliams
|
99794d04c2
|
jk assembly and arri-s wip
|
2023-01-31 11:52:10 -05:00 |
Matt McWilliams
|
cc06655cd6
|
Update debug
|
2023-01-23 00:28:26 -05:00 |
Matt McWilliams
|
ab6f517d27
|
Rails work
|
2023-01-17 12:04:03 -05:00 |
Matt McWilliams
|
f127dc1128
|
Merge remote-tracking branch 'origin/capper' into capper
|
2023-01-14 15:26:07 -05:00 |
Matt McWilliams
|
0b816ae8e1
|
Adjust the position of the Z axis, move the linear bearing up and down to prevent binding on motion
|
2023-01-14 15:25:53 -05:00 |
Matt McWilliams
|
c600fea4e1
|
Start rails concept
|
2023-01-12 19:26:05 -05:00 |
Matt McWilliams
|
92067bdbef
|
Add top part to assembly
|
2023-01-11 19:17:15 -05:00 |
Matt McWilliams
|
c181e003a3
|
First draft of base
|
2023-01-07 18:43:59 -05:00 |
Matt McWilliams
|
597137670d
|
Merge base work with knob changes
|
2023-01-06 10:31:25 -05:00 |
Matt McWilliams
|
3036aebbc4
|
Knob and collar work
|
2023-01-06 09:18:03 -05:00 |
Matt McWilliams
|
cbe6477af2
|
Improvements to bearing and Tnut size
|
2023-01-05 17:35:25 -05:00 |
Matthew McWilliams
|
c2546d2bc5
|
Add m3 nuts and bolts to threaded z movement
|
2023-01-05 14:40:25 -05:00 |
Matt McWilliams
|
46be1bfd3b
|
Assembly work. Adjusted design to simplify placement of 2 linear bearings
|
2023-01-04 23:11:48 -05:00 |
Matt McWilliams
|
1029885047
|
Update threaded Z, still needs m3 bolts
|
2023-01-04 18:26:22 -05:00 |
Matt McWilliams
|
164bde8cce
|
All arri s mount and jk lens assembly work. need to do some branch cleanup on this project and tackle capper issues for merge of this branch.
|
2023-01-03 21:16:19 -05:00 |
Matt McWilliams
|
41504caac9
|
Increase the bolt size on the bellows board
|
2023-01-02 17:11:44 -05:00 |
Matt McWilliams
|
9b34b4e026
|
Adjust the height of the mount (-14.5mm) and make bolt voids larger
|
2023-01-02 14:33:16 -05:00 |
Matt McWilliams
|
95612c1d18
|
Add m3 nuts
|
2023-01-02 14:30:54 -05:00 |
Matt McWilliams
|
0829ec9081
|
Use a variable
|
2023-01-02 13:53:41 -05:00 |
Matt McWilliams
|
ef0d246901
|
Increase the inner diameter of the bellows board to allow the threads to pass through cleanly and be held in place by the screw
|
2023-01-02 13:53:30 -05:00 |
Matt McWilliams
|
925659ba4b
|
Create an Arri S mount for the JK rails
|
2023-01-01 11:43:21 -05:00 |
Matt McWilliams
|
20c9287ac2
|
Work on concept JK lens assembly
|
2022-12-24 17:36:25 -05:00 |
Matt McWilliams
|
8aaa2b8940
|
Add a concept JK lens assembly
|
2022-12-24 01:55:11 -05:00 |
Matt McWilliams
|
30bd35e21d
|
Add an M4 nut to the common OpenSCAD lib
|
2022-12-24 01:54:57 -05:00 |
Matthew McWilliams
|
0c2e39f0b2
|
Arri bellows work
|
2022-12-23 23:01:37 -05:00 |
Matt McWilliams
|
ee1e9c9feb
|
Stepper firmware is working. Needed extra tape around coupling connector to add friction to connection and now it keeps.
|
2022-11-04 19:37:11 -04:00 |
Matt McWilliams
|
fcb77232ec
|
Create the driveCoupling module for the stepper motor design
|
2022-10-30 12:14:25 -04:00 |
Matt McWilliams
|
1fcbec7466
|
Work on stepper motor design and software. Motor still moves more slowly than it should but will investigate multiple factors leading to this result
|
2022-10-28 19:46:02 -04:00 |
Matt McWilliams
|
bb5b7c7897
|
Add divot to the drive coupling
|
2022-10-28 07:44:19 -04:00 |
Matt McWilliams
|
42b3aa767d
|
Allow for even more space for microswritch
|
2022-10-28 01:32:58 -04:00 |
Matt McWilliams
|
b20a6084e6
|
Allow for more space for the microswitch
|
2022-10-27 18:10:13 -04:00 |
Matthew McWilliams
|
d9a8576701
|
Adjust size of drive coupling for the DC connector
|
2022-10-21 16:05:56 -04:00 |
Matthew McWilliams
|
69273d2a1c
|
Increase scale of motor shaft void by 5%
|
2022-10-21 15:26:17 -04:00 |
Matthew McWilliams
|
755ea757f7
|
Add set screw for bearing and counter sink bolt caps for other cap m3s
|
2022-10-21 15:24:21 -04:00 |
Matt McWilliams
|
81fc54af8d
|
DC motor design has all components designed, need to print, test and adjust.
|
2022-10-19 06:38:56 -04:00 |
Matt McWilliams
|
4281ca4390
|
Work on Arri-S DC motor
|
2022-10-16 19:03:02 -04:00 |
Matt McWilliams
|
3419172535
|
Arri-S work
|
2022-10-15 00:13:05 -04:00 |
Matt McWilliams
|
206c266b08
|
Added Arri-S motor and cap measurements as taken 10/8/2022
|
2022-10-09 11:22:12 -04:00 |
Matthew McWilliams
|
5026cf869f
|
Arri-S work
|
2022-10-07 19:47:56 -04:00 |
Matt McWilliams
|
1964d6002d
|
Add mono logo as png, but might use svg instead. Render crashed PC.
|
2022-07-22 21:56:43 -04:00 |
Matt McWilliams
|
ea055d6e56
|
Capper case candidate
|
2022-07-13 23:04:00 -04:00 |
Matthew McWilliams
|
bc48765b35
|
Start work on base
|
2022-07-13 18:16:43 -04:00 |
Matthew McWilliams
|
70c2c695f0
|
All capper work. Need to wrap all actions in the 'b' command and push functionality to a lower level to prevent unneeded complexity.
|
2022-07-13 15:21:26 -04:00 |
Matthew McWilliams
|
c33c6e24f6
|
Work on motor rod
|
2022-07-13 09:01:25 -04:00 |
Matt McWilliams
|
2924efe39f
|
Reduce the size of the void for the screw in the cap.
|
2022-06-28 08:34:29 -04:00 |
Matt McWilliams
|
e275539fb0
|
Remove endstop completely and start rounding surfaces.
|
2022-06-22 07:45:01 -04:00 |
Matt McWilliams
|
4c13c54815
|
Updates to endstop mount design. Had incorrectly positioned voids for SMD chips on the endstop
|
2022-06-20 13:00:40 -04:00 |